Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2023 |
Principal Product | Bread |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 380,000 |
Annual Production | 126,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $703,598 | 14,871,120 | kWh | $0.05 |
Electricity Demand | $131,395 | 25,024 | kW-months/year | $5.25 |
Electricity Fees | $125,179 | - | $ | - |
Natural Gas | $769,180 | 99,246 | MMBtu | $7.75 |
TOTAL ENERGY COSTS | $2,022,491 | |||
RECOMMENDED SAVINGS* | $306,563 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,801 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,791 Cost: - |
$1,553 | 33,046 | $238 | 45 | - | - | - | - | - | - | - | - |
$1,553 33,046 kWh |
$238 45 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,036 Cost: $2,440 |
$3,499 | 74,457 | $537 | 102 | - | - | - | - | - | - | - | - |
$3,499 74,457 kWh |
$537 102 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $27,974 Cost: $35,815 |
$24,189 | 514,667 | $3,785 | 721 | - | - | - | - | - | - | - | - |
$24,189 514,667 kWh |
$3,785 721 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $28,034 Cost: $80,000 |
- | - | - | - | $28,034 | 3,617 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$28,034 3,617 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,556 Cost: $15,000 |
- | - | - | - | $4,556 | 588 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,556 588 MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1181 ELIMINATE A BY-PRODUCT |
Savings: $188,025 Cost: $700,000 |
$(-2,419) | (-51,450) | - | - | - | - | $(-63,229) | (-3,719) | $264,073 | 3,719,340 | $(-10,400) | - |
$(-2,419) (-51,450) kWh |
- - kW-months/year |
- - MMBtu |
$(-63,229) (-3,719) Tgal |
$264,073 3,719,340 gal |
$(-10,400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $52,147 Cost: $200,000 |
$47,264 | 1,005,618 | $4,883 | 930 | - | - | - | - | - | - | - | - |
$47,264 1,005,618 kWh |
$4,883 930 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $306,563 Cost: $1,033,255 |
$74,086 | 1,576,338 | $9,443 | 1,798 | $32,590 | 4,205 | $(-63,229) | (-3,719) | $264,073 | 3,719,340 | $(-10,400) | - | $74,086 1,576,338 kWh |
$9,443 1,798 kW-months/year |
$32,590 4,205 MMBtu |
$(-63,229) (-3,719) Tgal |
$264,073 3,719,340 gal |
$(-10,400) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,801 Cost: $38,255 |
$29,241 | 622,170 | $4,560 | 868 | - | - | - | - | - | - | - | - | $29,241 622,170 kWh |
$4,560 868 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||