IAC Assessment: LE0540
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0540
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2023
Principal Product Triglycerides
NAICS 311225 - Fats and Oils Refining and Blending
SIC 2079 - Edible Fats And Oils, Nec
Sales $50,000,000-$100,000,000
# of Employees 64
Plant Area (Sq.Ft.) 150,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 8,600
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,674 6,319,544 kWh $0.06
Electricity Demand $104,962 11,764 kW-months/year $8.92
Electricity Fees $80,856 - $ -
Natural Gas $1,583,931 308,602 MMBtu $5.13
TOTAL ENERGY COSTS $2,173,423
RECOMMENDED SAVINGS* $190,854 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,565
Cost:
$11,000
$13,903 217,235 $2,662 298 - - $13,903
217,235
kWh
$2,662
298
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$841
Cost:
$1,040
$841 13,140 - - - - $841
13,140
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,247
Cost:
$36,000
$22,811 356,422 $4,436 497 - - $22,811
356,422
kWh
$4,436
497
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,521
Cost:
$9,000
$4,634 72,411 $887 99 - - $4,634
72,411
kWh
$887
99
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,080
Cost:
$1,908
- - - - $1,080 210 -
-
kWh
-
-
kW-months/year
$1,080
210
MMBtu
06: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$11,386
Cost:
$45,000
$1,080 16,883 - - $10,306 2,009 $1,080
16,883
kWh
-
-
kW-months/year
$10,306
2,009
MMBtu
07: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$128,214
Cost:
$580,000
- - - - $128,214 24,993 -
-
kWh
-
-
kW-months/year
$128,214
24,993
MMBtu
TOTAL RECOMMENDED Savings:
$190,854
Cost:
$683,948
$43,269 676,091 $7,985 894 $139,600 27,212 $43,269
676,091
kWh
$7,985
894
kW-months/year
$139,600
27,212
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas