Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2023 |
Principal Product | Chemical Processing |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 800,000 Pounds |
Production Hrs. Annual | 2,080 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $433,811 | 8,168,400 | kWh | $0.05 |
Electricity Demand | $69,492 | 27,284 | kW-months/year | $2.55 |
Electricity Fees | $6,004 | - | $ | - |
TOTAL ENERGY COSTS | $509,307 | |||
RECOMMENDED SAVINGS* | $56,399 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,184 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Increase in Production | Electricity Usage | Electricity Demand | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,946 Cost: $100 |
$3,821 | 72,100 | $1,125 | 441 | - | - |
$3,821 72,100 kWh |
$1,125 441 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $14,153 Cost: $11,000 |
$10,983 | 207,222 | $3,170 | 1,243 | - | - |
$10,983 207,222 kWh |
$3,170 1,243 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,870 Cost: $2,400 |
$1,452 | 27,413 | $418 | 164 | - | - |
$1,452 27,413 kWh |
$418 164 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,184 Cost: $4,100 |
$2,756 | 52,000 | $428 | 168 | - | - |
$2,756 52,000 kWh |
$428 168 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,260 Cost: $9,128 |
$5,209 | 98,296 | $1,051 | 412 | - | - |
$5,209 98,296 kWh |
$1,051 412 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $986 Cost: $2,000 |
$591 | 11,147 | $395 | 155 | - | - |
$591 11,147 kWh |
$395 155 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $25,000 Cost: $120,000 |
- | - | - | - | $25,000 | - |
- - kWh |
- - kW-months/year |
$25,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,399 Cost: $148,728 |
$24,812 | 468,178 | $6,587 | 2,583 | $25,000 | - | $24,812 468,178 kWh |
$6,587 2,583 kW-months/year |
$25,000 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,184 Cost: $4,100 |
$2,756 | 52,000 | $428 | 168 | - | - | $2,756 52,000 kWh |
$428 168 kW-months/year |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Increase in Production | Electricity Usage | Electricity Demand | Increase in Production |