IAC logo
IAC Assessment: LE0558
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0558
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product Metering Equipment
NAICS 335311 - Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 17,000
Annual Production 10,000 Units
Production Hrs. Annual 4,264
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,795 605,760 kWh $0.17
Electricity Demand $10,265 1,926 kW-months/year $5.33
Electricity Fees $2,487 - $ -
Natural Gas $3,935 316 MMBtu $12.45
TOTAL ENERGY COSTS $119,482
RECOMMENDED SAVINGS* $20,840 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,944
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,762
Cost:
$1,400
$1,639 9,639 $123 23 - - $1,639
9,639
kWh
$123
23
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,863
Cost:
$5,799
$3,628 21,344 $235 44 - - $3,628
21,344
kWh
$235
44
kW-months/year
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,010
Cost:
$1,600
$873 5,134 - - $137 11 $873
5,134
kWh
-
-
kW-months/year
$137
11
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$896
Cost:
$2,000
$832 4,897 $64 12 - - $832
4,897
kWh
$64
12
kW-months/year
-
-
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,840
Cost:
$18,014
$4,501 26,482 $339 64 - - $4,501
26,482
kWh
$339
64
kW-months/year
-
-
MMBtu
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$7,995
Cost:
$37,000
$7,160 42,118 $438 82 $397 32 $7,160
42,118
kWh
$438
82
kW-months/year
$397
32
MMBtu
07: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$474
Cost:
$2,500
- - - - $474 38 -
-
kWh
-
-
kW-months/year
$474
38
MMBtu
TOTAL RECOMMENDED Savings:
$20,840
Cost:
$68,313
$18,633 109,614 $1,199 225 $1,008 81 $18,633
109,614
kWh
$1,199
225
kW-months/year
$1,008
81
MMBtu
TOTAL IMPLEMENTED Savings:
$19,944
Cost:
$66,313
$17,801 104,717 $1,135 213 $1,008 81 $17,801
104,717
kWh
$1,135
213
kW-months/year
$1,008
81
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas