IAC Assessment: LE0573
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0573
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 26
Plant Area (Sq.Ft.) 435,600
Annual Production 4,000,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $456,328 7,480,800 kWh $0.06
Electricity Demand $34,004 13,350 kW-months/year $2.55
Electricity Fees $3,939 - $ -
Other Gas $1 63,329 MMBtu $0.00
TOTAL ENERGY COSTS $494,272
RECOMMENDED SAVINGS* $559,756 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,259
Cost:
$4,198
$4,177 68,480 $82 32 - - $4,177
68,480
kWh
$82
32
kW-months/year
-
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$8,341
Cost:
$20,400
$7,887 129,293 $454 178 - - $7,887
129,293
kWh
$454
178
kW-months/year
-
-
$
03: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$361,764
Cost:
$1,321,539
$342,119 5,608,512 $19,645 7,704 - - $342,119
5,608,512
kWh
$19,645
7,704
kW-months/year
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,318
Cost:
$5,952
$1,259 20,634 $59 23 - - $1,259
20,634
kWh
$59
23
kW-months/year
-
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$184,074
Cost:
$995,727
$79,508 1,303,411 $4,566 1,790 $100,000 - $79,508
1,303,411
kWh
$4,566
1,790
kW-months/year
$100,000
-
$
TOTAL RECOMMENDED Savings:
$559,756
Cost:
$2,347,816
$434,950 7,130,330 $24,806 9,727 $100,000 - $434,950
7,130,330
kWh
$24,806
9,727
kW-months/year
$100,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost