IAC logo
IAC Assessment: LE0580
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0580
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2024
Principal Product Kosher Milk
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $1,000,000-$5,000,000
# of Employees 75
Plant Area (Sq.Ft.) 70,000
Annual Production 107,730 Tons
Production Hrs. Annual 7,644
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $491,741 5,238,724 kWh $0.09
Electricity Demand $93,459 15,247 kW-months/year $6.13
Electricity Fees $2,341 - $ -
Natural Gas $99,826 29,535 MMBtu $3.38
TOTAL ENERGY COSTS $687,367
RECOMMENDED SAVINGS* $264,878 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,713
Cost:
$2,350
$7,904 84,084 $809 132 - - $7,904
84,084
kWh
$809
132
kW-months/year
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$51,486
Cost:
$26,800
$46,705 496,860 $4,781 780 - - $46,705
496,860
kWh
$4,781
780
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,743
Cost:
$17,793
$9,033 96,096 $9,710 1,584 - - $9,033
96,096
kWh
$9,710
1,584
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,807
Cost:
$11,787
$8,047 85,607 $760 124 - - $8,047
85,607
kWh
$760
124
kW-months/year
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$58,861
Cost:
$112,160
$56,826 604,531 $2,035 332 - - $56,826
604,531
kWh
$2,035
332
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,713
Cost:
$24,500
$6,094 64,152 $619 101 - - $6,094
64,152
kWh
$619
101
kW-months/year
-
-
$
07: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$111,555
Cost:
$686,000
$58,600 623,404 - - $52,955 - $58,600
623,404
kWh
-
-
kW-months/year
$52,955
-
$
TOTAL RECOMMENDED Savings:
$264,878
Cost:
$881,390
$193,209 2,054,734 $18,714 3,053 $52,955 - $193,209
2,054,734
kWh
$18,714
3,053
kW-months/year
$52,955
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost