IAC Assessment: LE0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2025
Principal Product Fertilizer (Mixing Only) Manufacturing
NAICS 325314 - Fertilizer (Mixing Only) Manufacturing
SIC 2875 - Fertilizers, Mixing Only
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 102,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,993 818,855 kWh $0.10
Electricity Demand $18,721 3,662 kW-months/year $5.11
Electricity Fees $4,195 - $ -
Natural Gas $40,791 7,484 MMBtu $5.45
TOTAL ENERGY COSTS $145,700
RECOMMENDED SAVINGS* $173,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,871
Cost:
-
- - $1,871 366 - - - - -
-
kWh
$1,871
366
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,030
Cost:
$100
$796 7,968 $234 46 - - - - $796
7,968
kWh
$234
46
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,504
Cost:
$600
$1,504 15,039 - - - - - - $1,504
15,039
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,377
Cost:
$2,400
$1,064 10,646 $313 61 - - - - $1,064
10,646
kWh
$313
61
kW-months/year
-
-
MMBtu
-
-
$
05: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$148,846
Cost:
$350,000
- - - - - - $148,846 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$148,846
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,853
Cost:
$5,000
- - - - $1,853 340 - - -
-
kWh
-
-
kW-months/year
$1,853
340
MMBtu
-
-
$
07: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$9,000
Cost:
$31,500
$7,600 75,900 $3,400 665 $(-2,000) (-364) - - $7,600
75,900
kWh
$3,400
665
kW-months/year
$(-2,000)
(-364)
MMBtu
-
-
$
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$8,045
Cost:
$30,000
$(-1,117) (-11,172) $(-92) (-18) $9,254 1,698 - - $(-1,117)
(-11,172)
kWh
$(-92)
(-18)
kW-months/year
$9,254
1,698
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$173,526
Cost:
$419,600
$9,847 98,381 $5,726 1,120 $9,107 1,674 $148,846 - $9,847
98,381
kWh
$5,726
1,120
kW-months/year
$9,107
1,674
MMBtu
$148,846
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost