IAC Assessment: LE0588
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0588
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2025
Principal Product Tempered Glass
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 45,500
Annual Production 1,974 Tons
Production Hrs. Annual 2,340
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,254 1,119,910 kWh $0.12
Electricity Demand $272,219 6,805 kW-months/year $40.00
Electricity Fees $6,311 - $ -
Natural Gas $10,958 479 MMBtu $22.88
Fuel Oil #1 $71,304 2,534 MMBtu $28.14
TOTAL ENERGY COSTS $491,046
RECOMMENDED SAVINGS* $219,999 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,523
Cost:
-
- - - - $1,489 - - - - - $34 - - - -
-
kWh
-
-
kW-months/year
$1,489
-
$
-
-
MMBtu
-
-
MMBtu
$34
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,235
Cost:
$100
$435 3,752 $800 20 - - - - - - - - - - $435
3,752
kWh
$800
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,412
Cost:
$1,256
$845 7,403 $1,567 39 - - - - - - - - - - $845
7,403
kWh
$1,567
39
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,600
Cost:
$26,934
- - $13,600 340 - - - - - - - - - - -
-
kWh
$13,600
340
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$25,169
Cost:
$56,274
$(-12,294) (-105,972) - - - - - - $37,463 1,166 - - - - $(-12,294)
(-105,972)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$37,463
1,166
MMBtu
-
-
$
-
-
$
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$938
Cost:
$2,500
- - - - - - $938 41 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$938
41
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$175,084
Cost:
$635,000
$8,930 76,986 - - - - - - - - - - $166,154 - $8,930
76,986
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
$166,154
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$38
Cost:
$140
$38 329 - - - - - - - - - - - - $38
329
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$219,999
Cost:
$722,204
$(-2,046) (-17,502) $15,967 399 $1,489 - $938 41 $37,463 1,166 $34 - $166,154 - $(-2,046)
(-17,502)
kWh
$15,967
399
kW-months/year
$1,489
-
$
$938
41
MMBtu
$37,463
1,166
MMBtu
$34
-
$
$166,154
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Fuel Oil #1 One-time Revenue or Avoided Cost Primary Product