IAC logo
IAC Assessment: LE0589
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0589
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2025
Principal Product Other Basic Inorganic Chemical Manufacturing
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 81
Plant Area (Sq.Ft.) 40,000
Annual Production 90,000,000 Pounds
Production Hrs. Annual 3,120
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,047 4,395,152 kWh $0.02
Electricity Demand $79,860 10,525 kW-months/year $7.59
Electricity Fees $3,787 - $ -
Natural Gas $149,723 11,013 MMBtu $13.60
TOTAL ENERGY COSTS $336,417
RECOMMENDED SAVINGS* $140,994 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.651 INSTALL BACK-UP EQUIPMENT Savings:
$125,769
Cost:
$50,000
- - - - - - $125,769 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$125,769
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,428
Cost:
$3,300
$4,423 192,394 $2,005 264 - - - - $4,423
192,394
kWh
$2,005
264
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,179
Cost:
$800
$1,179 51,280 - - - - - - $1,179
51,280
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$651
Cost:
$1,275
$651 28,305 - - - - - - $651
28,305
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,588
Cost:
$5,000
$(-300) (-13,034) $(-137) (-18) $2,025 149 - - $(-300)
(-13,034)
kWh
$(-137)
(-18)
kW-months/year
$2,025
149
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,173
Cost:
$4,403
$517 22,464 $656 86 - - - - $517
22,464
kWh
$656
86
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$4,206
Cost:
$19,974
$3,074 133,674 $1,132 149 - - - - $3,074
133,674
kWh
$1,132
149
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$140,994
Cost:
$84,752
$9,544 415,083 $3,656 481 $2,025 149 $125,769 - $9,544
415,083
kWh
$3,656
481
kW-months/year
$2,025
149
MMBtu
$125,769
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost