IAC Assessment: LE0593
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0593
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2025
Principal Product Bulk Material Equipment
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 90,195
Annual Production 10,000 Pieces
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,343 610,669 kWh $0.08
Electricity Demand $6,780 2,659 kW-months/year $2.55
Electricity Fees $5,600 - $ -
Natural Gas $49,266 11,492 MMBtu $4.29
TOTAL ENERGY COSTS $111,989
RECOMMENDED SAVINGS* $59,525 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$19,297
Cost:
-
$6,191 75,499 - - $13,106 3,055 $6,191
75,499
kWh
-
-
kW-months/year
$13,106
3,055
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,196
Cost:
$1,640
$7,859 95,843 $337 132 - - $7,859
95,843
kWh
$337
132
kW-months/year
-
-
MMBtu
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$15,667
Cost:
$20,000
$(-381) (-4,655) $(-69) (-27) $16,117 3,757 $(-381)
(-4,655)
kWh
$(-69)
(-27)
kW-months/year
$16,117
3,757
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,704
Cost:
$4,000
$1,646 20,563 $58 23 - - $1,646
20,563
kWh
$58
23
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,724
Cost:
$13,069
$6,448 78,624 $276 108 - - $6,448
78,624
kWh
$276
108
kW-months/year
-
-
MMBtu
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,077
Cost:
$35,157
$6,842 83,430 $235 92 - - $6,842
83,430
kWh
$235
92
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$133
Cost:
$479
$133 1,627 - - - - $133
1,627
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$727
Cost:
$3,014
$617 7,522 $110 43 - - $617
7,522
kWh
$110
43
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$59,525
Cost:
$77,359
$29,355 358,453 $947 371 $29,223 6,812 $29,355
358,453
kWh
$947
371
kW-months/year
$29,223
6,812
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas