Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Lehigh University |
---|---|
Assessment Year | 2025 |
Principal Product | coated metal parts |
NAICS | 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479 - Metal Coating And Allied Services |
Sales | $1,000,000-$5,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 240,000 Pieces |
Production Hrs. Annual | 4,335 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $58,550 | 737,888 | kWh | $0.08 |
Electricity Demand | $9,046 | 3,219 | kW-months/year | $2.81 |
Electricity Fees | $4,569 | - | $ | - |
LPG | $112,753 | 10,087 | MMBtu | $11.18 |
TOTAL ENERGY COSTS | $184,918 | |||
RECOMMENDED SAVINGS* | $87,898 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | LPG | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,456 Cost: - |
- | - | - | - | $3,456 | 310 | - | - |
- - kWh |
- - kW-months/year |
$3,456 310 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,393 Cost: $1,560 |
$4,910 | 62,150 | $483 | 172 | - | - | - | - |
$4,910 62,150 kWh |
$483 172 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $2,962 Cost: $2,500 |
- | - | - | - | $2,962 | 265 | - | - |
- - kWh |
- - kW-months/year |
$2,962 265 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $42,706 Cost: $75,000 |
- | - | - | - | - | - | $42,706 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$42,706 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $8,003 Cost: $22,000 |
- | - | - | - | $8,003 | 716 | - | - |
- - kWh |
- - kW-months/year |
$8,003 716 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $5,643 Cost: $16,923 |
$5,137 | 65,025 | $506 | 180 | - | - | - | - |
$5,137 65,025 kWh |
$506 180 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,206 Cost: $17,020 |
$3,666 | 45,350 | $540 | 192 | - | - | - | - |
$3,666 45,350 kWh |
$540 192 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $15,529 Cost: $74,000 |
- | - | - | - | - | - | $15,529 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$15,529 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $87,898 Cost: $209,003 |
$13,713 | 172,525 | $1,529 | 544 | $14,421 | 1,291 | $58,235 | - | $13,713 172,525 kWh |
$1,529 544 kW-months/year |
$14,421 1,291 MMBtu |
$58,235 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | LPG | One-time Revenue or Avoided Cost |