IAC logo
IAC Assessment: LE0600
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LE0600
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2025
Principal Product Coated Products
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672 - Paper Coated And Laminated, Nec
Sales $50,000,000-$100,000,000
# of Employees 109
Plant Area (Sq.Ft.) 92,590
Annual Production 17,760,961 Pounds
Production Hrs. Annual 7,488
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,217 1,739,210 kWh $0.10
Electricity Demand $36,643 3,978 kW-months/year $9.21
Natural Gas $403,209 47,825 MMBtu $8.43
TOTAL ENERGY COSTS $615,069
RECOMMENDED SAVINGS* $157,281 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,082
Cost:
-
$962 9,522 $120 13 - - $962
9,522
kWh
$120
13
kW-months/year
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$92,399
Cost:
$480
$8,023 79,436 - - $84,376 10,009 $8,023
79,436
kWh
-
-
kW-months/year
$84,376
10,009
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,925
Cost:
$420
$6,925 68,560 - - - - $6,925
68,560
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,149
Cost:
$2,600
$11,685 115,697 $1,464 159 - - $11,685
115,697
kWh
$1,464
159
kW-months/year
-
-
MMBtu
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$2,757
Cost:
$2,500
- - - - $2,757 327 -
-
kWh
-
-
kW-months/year
$2,757
327
MMBtu
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$14,877
Cost:
$20,000
- - - - $14,877 1,765 -
-
kWh
-
-
kW-months/year
$14,877
1,765
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,555
Cost:
$7,500
$4,937 48,878 $618 67 - - $4,937
48,878
kWh
$618
67
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,572
Cost:
$26,690
$14,362 142,197 $2,210 240 - - $14,362
142,197
kWh
$2,210
240
kW-months/year
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,420
Cost:
$4,000
$1,273 12,600 $147 16 - - $1,273
12,600
kWh
$147
16
kW-months/year
-
-
MMBtu
10: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,545
Cost:
$9,511
$2,342 23,184 $203 22 - - $2,342
23,184
kWh
$203
22
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$157,281
Cost:
$73,701
$50,509 500,074 $4,762 517 $102,010 12,101 $50,509
500,074
kWh
$4,762
517
kW-months/year
$102,010
12,101
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas