IAC logo
IAC Assessment: LL0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2001
Principal Product Oil/Gas Platforms and Instrumentation Panels
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 1,726,618
Annual Production 8,500 Tons
Production Hrs. Annual 3,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,552 2,065,551 kWh $0.07
Electricity Demand $40,189 7,231 kW-months/year $5.56
Electricity Fees $(-24,830) - $ -
Natural Gas $1,177 216 MMBtu $5.45
TOTAL ENERGY COSTS $179,300
RECOMMENDED SAVINGS* $10,897 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,557
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Water Disposal Water Consumption Electricity Usage Electricity Fees Water Disposal Water Consumption
$ kWh $ $ $ Tgal $ Tgal
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$268
Cost:
-
- - $268 - - - - - -
-
kWh
$268
-
$
-
-
Tgal
-
-
Tgal
02: 2.8112 COMBINE UTILITY METERS Savings:
$2,400
Cost:
-
- - $2,400 - - - - - -
-
kWh
$2,400
-
$
-
-
Tgal
-
-
Tgal
03: 2.8112 COMBINE UTILITY METERS Savings:
$240
Cost:
-
- - - - - - $240 - -
-
kWh
-
-
$
-
-
Tgal
$240
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,889
Cost:
$300
$2,778 55,821 $111 - - - - - $2,778
55,821
kWh
$111
-
$
-
-
Tgal
-
-
Tgal
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$5,100
Cost:
-
- - - - $5,100 2,106,650 - - -
-
kWh
-
-
$
$5,100
2,106,650
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$10,897
Cost:
$300
$2,778 55,821 $2,779 - $5,100 2,106,650 $240 - $2,778
55,821
kWh
$2,779
-
$
$5,100
2,106,650
Tgal
$240
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,557
Cost:
$300
$2,778 55,821 $2,779 - - - - - $2,778
55,821
kWh
$2,779
-
$
-
-
Tgal
-
-
Tgal
Savings
Cost
$ kWh $ $ $ Tgal $ Tgal
Electricity Usage Electricity Fees Water Disposal Water Consumption Electricity Usage Electricity Fees Water Disposal Water Consumption