IAC Assessment: LL0127
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0127
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2002
Principal Product Corrugated Containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 400,000
Annual Production 81,000 Tons
Production Hrs. Annual 6,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $821,939 10,772,000 kWh $0.08
Electricity Demand $63,136 21,548 kW-months/year $2.93
Electricity Fees $32,877 - $ -
Natural Gas $699,873 111,523 MMBtu $6.28
TOTAL ENERGY COSTS $1,617,825
RECOMMENDED SAVINGS* $68,632 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,438
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$36,202
Cost:
$24,480
- - - - - - $36,202 6,196 -
-
kWh
-
-
kW-months/year
-
-
$
$36,202
6,196
MMBtu
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$17,992
Cost:
$946
$15,521 202,464 $1,779 607 $692 - - - $15,521
202,464
kWh
$1,779
607
kW-months/year
$692
-
$
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,380
Cost:
$4,526
- - - - - - $6,380 1,134 -
-
kWh
-
-
kW-months/year
-
-
$
$6,380
1,134
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$6,088
Cost:
$900
- - - - - - $6,088 1,150 -
-
kWh
-
-
kW-months/year
-
-
$
$6,088
1,150
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,970
Cost:
$6,440
- - $1,894 646 $76 - - - -
-
kWh
$1,894
646
kW-months/year
$76
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$68,632
Cost:
$37,292
$15,521 202,464 $3,673 1,253 $768 - $48,670 8,480 $15,521
202,464
kWh
$3,673
1,253
kW-months/year
$768
-
$
$48,670
8,480
MMBtu
TOTAL IMPLEMENTED Savings:
$14,438
Cost:
$11,866
- - $1,894 646 $76 - $12,468 2,284 -
-
kWh
$1,894
646
kW-months/year
$76
-
$
$12,468
2,284
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas