IAC logo
IAC Assessment: LL0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2002
Principal Product Oilfield screen assemblies
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 73,500
Annual Production 67,000 Pieces
Production Hrs. Annual 7,488
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $189,090 2,666,400 kWh $0.07
Electricity Demand $41,279 7,345 kW-months/year $5.62
Electricity Fees $(-43,564) - $ -
TOTAL ENERGY COSTS $186,805
RECOMMENDED SAVINGS* $16,592 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $909
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$10,847
Cost:
$3,747
$10,430 143,213 - - $417 - $10,430
143,213
kWh
-
-
kW-months/year
$417
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,864
Cost:
$9,240
- - $3,715 661 $149 - -
-
kWh
$3,715
661
kW-months/year
$149
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$909
Cost:
$1,097
$874 12,000 - - $35 - $874
12,000
kWh
-
-
kW-months/year
$35
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$600
Cost:
-
- - - - $600 - -
-
kWh
-
-
kW-months/year
$600
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$213
Cost:
$81
$160 2,196 $45 8 $8 - $160
2,196
kWh
$45
8
kW-months/year
$8
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$159
Cost:
-
$91 1,248 $62 11 $6 - $91
1,248
kWh
$62
11
kW-months/year
$6
-
$
TOTAL RECOMMENDED Savings:
$16,592
Cost:
$14,165
$11,555 158,657 $3,822 680 $1,215 - $11,555
158,657
kWh
$3,822
680
kW-months/year
$1,215
-
$
TOTAL IMPLEMENTED Savings:
$909
Cost:
$1,097
$874 12,000 - - $35 - $874
12,000
kWh
-
-
kW-months/year
$35
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees