IAC logo
IAC Assessment: LL0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2002
Principal Product Hot sauces and peppers
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 6,500
Annual Production 25,000,000 Pieces
Production Hrs. Annual 2,600
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,178 656,285 kWh $0.05
Electricity Demand $27,256 3,610 kW-months/year $7.55
Electricity Fees $2,497 - $ -
Natural Gas $23,796 4,407 MMBtu $5.40
TOTAL ENERGY COSTS $99,601
RECOMMENDED SAVINGS* $20,278 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,518
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,787
Cost:
$435
$3,641 68,248 - - $146 - - - - - $3,641
68,248
kWh
-
-
kW-months/year
$146
-
$
-
-
MMBtu
-
-
Tgal
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,835
Cost:
$3,325
- - $2,726 361 $109 - - - - - -
-
kWh
$2,726
361
kW-months/year
$109
-
$
-
-
MMBtu
-
-
Tgal
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,243
Cost:
$4,465
- - - - - - $2,243 368 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,243
368
MMBtu
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$457
Cost:
$754
- - - - - - $457 75 - - -
-
kWh
-
-
kW-months/year
-
-
$
$457
75
MMBtu
-
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$225
Cost:
$378
- - - - - - $225 37 - - -
-
kWh
-
-
kW-months/year
-
-
$
$225
37
MMBtu
-
-
Tgal
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$9,786
Cost:
-
- - - - - - - - $9,786 6,974,595 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,786
6,974,595
Tgal
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$945
Cost:
-
- - - - - - - - $945 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$945
-
Tgal
TOTAL RECOMMENDED Savings:
$20,278
Cost:
$9,357
$3,641 68,248 $2,726 361 $255 - $2,925 480 $10,731 6,974,595 $3,641
68,248
kWh
$2,726
361
kW-months/year
$255
-
$
$2,925
480
MMBtu
$10,731
6,974,595
Tgal
TOTAL IMPLEMENTED Savings:
$14,518
Cost:
$435
$3,641 68,248 - - $146 - - - $10,731 6,974,595 $3,641
68,248
kWh
-
-
kW-months/year
$146
-
$
-
-
MMBtu
$10,731
6,974,595
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal