IAC logo
IAC Assessment: LL0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2003
Principal Product Oilfiled Tools
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $50,000,000-$100,000,000
# of Employees 240
Plant Area (Sq.Ft.) 45,000
Annual Production 6,000 Pieces
Production Hrs. Annual 7,280
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,849 2,661,023 kWh $0.04
Electricity Demand $43,336 5,896 kW-months/year $7.35
Electricity Fees $6,876 - $ -
Natural Gas $163,011 31,300 MMBtu $5.21
TOTAL ENERGY COSTS $321,472
RECOMMENDED SAVINGS* $30,133 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,933
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,992
Cost:
$825
$6,002 165,058 $1,683 229 $307 - - - - - $6,002
165,058
kWh
$1,683
229
kW-months/year
$307
-
$
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,007
Cost:
-
$2,891 79,503 - - $116 - - - - - $2,891
79,503
kWh
-
-
kW-months/year
$116
-
$
-
-
lb
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,939
Cost:
$3,429
$2,209 60,761 $617 84 $113 - - - - - $2,209
60,761
kWh
$617
84
kW-months/year
$113
-
$
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$960
Cost:
$428
$673 18,521 $250 34 $37 - - - - - $673
18,521
kWh
$250
34
kW-months/year
$37
-
$
-
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,240
Cost:
-
- - - - - - $6,240 50 - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,240
50
lb
-
-
$
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$8,995
Cost:
$12,400
- - - - - - - - $8,995 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$8,995
-
$
TOTAL RECOMMENDED Savings:
$30,133
Cost:
$17,082
$11,775 323,843 $2,550 347 $573 - $6,240 50 $8,995 - $11,775
323,843
kWh
$2,550
347
kW-months/year
$573
-
$
$6,240
50
lb
$8,995
-
$
TOTAL IMPLEMENTED Savings:
$22,933
Cost:
$16,654
$11,102 305,322 $2,300 313 $536 - - - $8,995 - $11,102
305,322
kWh
$2,300
313
kW-months/year
$536
-
$
-
-
lb
$8,995
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) One-time Revenue or Avoided Cost