IAC logo
IAC Assessment: LL0155
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2003
Principal Product Rope
NAICS 314994 - Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills
SIC 2298 - Cordage And Twine
Sales $5,000,000-$10,000,000
# of Employees 97
Plant Area (Sq.Ft.) 78,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $246,974 4,382,400 kWh $0.06
Electricity Fees $9,861 - $ -
Natural Gas $6,548 814 MMBtu $8.04
TOTAL ENERGY COSTS $263,383
RECOMMENDED SAVINGS* $49,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,035
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes
$ kWh $ $ $ MMBtu $ $
01: 2.1224 REPLACE BOILER Savings:
$17,740
Cost:
$33,000
$34,492 612,000 $670 - $(-17,422) (-2,292) - - $34,492
612,000
kWh
$670
-
$
$(-17,422)
(-2,292)
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,929
Cost:
$975
$1,855 32,906 $74 - - - - - $1,855
32,906
kWh
$74
-
$
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,265
Cost:
$262
$1,216 21,577 $49 - - - - - $1,216
21,577
kWh
$49
-
$
-
-
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$839
Cost:
$75
$802 14,227 $37 - - - - - $802
14,227
kWh
$37
-
$
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$712
Cost:
$756
- - - - $712 88 - - -
-
kWh
-
-
$
$712
88
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$518
Cost:
$364
$498 8,842 $20 - - - - - $498
8,842
kWh
$20
-
$
-
-
MMBtu
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$25,317
Cost:
$13,100
- - - - - - $25,317 - -
-
kWh
-
-
$
-
-
MMBtu
$25,317
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,006
Cost:
$186
- - - - - - $1,006 - -
-
kWh
-
-
$
-
-
MMBtu
$1,006
-
$
TOTAL RECOMMENDED Savings:
$49,326
Cost:
$48,718
$38,863 689,552 $850 - $(-16,710) (-2,204) $26,323 - $38,863
689,552
kWh
$850
-
$
$(-16,710)
(-2,204)
MMBtu
$26,323
-
$
TOTAL IMPLEMENTED Savings:
$30,035
Cost:
$14,887
$3,569 63,325 $143 - - - $26,323 - $3,569
63,325
kWh
$143
-
$
-
-
MMBtu
$26,323
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Fees Natural Gas Personnel Changes