IAC logo
IAC Assessment: LL0162
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0162
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2003
Principal Product Bread
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 166
Plant Area (Sq.Ft.) 130,000
Annual Production 53,000,000 Pounds
Production Hrs. Annual 7,280
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $362,065 7,794,392 kWh $0.05
Electricity Demand $79,158 14,085 kW-months/year $5.62
Electricity Fees $24,268 - $ -
Natural Gas $150,821 31,563 MMBtu $4.78
TOTAL ENERGY COSTS $644,468
RECOMMENDED SAVINGS* $59,822 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,445
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,597
Cost:
$4,620
$14,997 322,857 - - $600 - - - $14,997
322,857
kWh
-
-
kW-months/year
$600
-
$
-
-
lb
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$11,299
Cost:
$855
$10,027 215,870 $837 149 $435 - - - $10,027
215,870
kWh
$837
149
kW-months/year
$435
-
$
-
-
lb
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,812
Cost:
$683
$7,512 161,728 - - $300 - - - $7,512
161,728
kWh
-
-
kW-months/year
$300
-
$
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,770
Cost:
-
$6,206 133,612 $1,265 225 $299 - - - $6,206
133,612
kWh
$1,265
225
kW-months/year
$299
-
$
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,099
Cost:
$2,310
- - $2,018 - $81 - - - -
-
kWh
$2,018
-
kW-months/year
$81
-
$
-
-
lb
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$938
Cost:
$82
$370 7,957 $90 16 $478 - - - $370
7,957
kWh
$90
16
kW-months/year
$478
-
$
-
-
lb
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$229
Cost:
$205
$164 3,523 $56 10 $9 - - - $164
3,523
kWh
$56
10
kW-months/year
$9
-
$
-
-
lb
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$14,078
Cost:
$3,120
- - - - - - $14,078 31,280 -
-
kWh
-
-
kW-months/year
-
-
$
$14,078
31,280
lb
TOTAL RECOMMENDED Savings:
$59,822
Cost:
$11,875
$39,276 845,547 $4,266 400 $2,202 - $14,078 31,280 $39,276
845,547
kWh
$4,266
400
kW-months/year
$2,202
-
$
$14,078
31,280
lb
TOTAL IMPLEMENTED Savings:
$37,445
Cost:
$7,740
$21,203 456,469 $1,265 225 $899 - $14,078 31,280 $21,203
456,469
kWh
$1,265
225
kW-months/year
$899
-
$
$14,078
31,280
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)