IAC Assessment: LL0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2004
Principal Product salad dressing
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $50,000,000-$100,000,000
# of Employees 80
Plant Area (Sq.Ft.) 250,000
Annual Production 233,333,333 Pounds
Production Hrs. Annual 3,120
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $551,997 11,954,577 kWh $0.05
Electricity Demand $184,247 21,006 kW-months/year $8.77
Electricity Fees $28,259 - $ -
Natural Gas $705,857 128,480 MMBtu $5.49
TOTAL ENERGY COSTS $1,594,104
RECOMMENDED SAVINGS* $126,412 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $122,030
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$33,535
Cost:
$960
$32,307 699,742 - - $1,228 - - - - - $32,307
699,742
kWh
-
-
kW-months/year
$1,228
-
$
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$25,020
Cost:
$2,910
$19,114 413,995 $4,990 569 $916 - - - - - $19,114
413,995
kWh
$4,990
569
kW-months/year
$916
-
$
-
-
lb
-
-
$
03: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$13,735
Cost:
$304
$13,232 286,587 - - $503 - - - - - $13,232
286,587
kWh
-
-
kW-months/year
$503
-
$
-
-
lb
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,382
Cost:
$24,514
- - $4,382 - - - - - - - -
-
kWh
$4,382
-
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,985
Cost:
$720
$1,912 41,407 - - $73 - - - - - $1,912
41,407
kWh
-
-
kW-months/year
$73
-
$
-
-
lb
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$935
Cost:
$525
$231 4,993 - - $9 - - - $695 - $231
4,993
kWh
-
-
kW-months/year
$9
-
$
-
-
lb
$695
-
$
07: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$544
Cost:
$585
$524 11,357 - - $20 - - - - - $524
11,357
kWh
-
-
kW-months/year
$20
-
$
-
-
lb
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$292
Cost:
$120
$281 6,076 - - $11 - - - - - $281
6,076
kWh
-
-
kW-months/year
$11
-
$
-
-
lb
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$41,244
Cost:
-
- - - - - - $41,244 909,695 - - -
-
kWh
-
-
kW-months/year
-
-
$
$41,244
909,695
lb
-
-
$
10: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,740
Cost:
$5,697
- - - - - - - - $4,740 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$4,740
-
$
TOTAL RECOMMENDED Savings:
$126,412
Cost:
$36,335
$67,601 1,464,157 $9,372 569 $2,760 - $41,244 909,695 $5,435 - $67,601
1,464,157
kWh
$9,372
569
kW-months/year
$2,760
-
$
$41,244
909,695
lb
$5,435
-
$
TOTAL IMPLEMENTED Savings:
$122,030
Cost:
$11,821
$67,601 1,464,157 $4,990 569 $2,760 - $41,244 909,695 $5,435 - $67,601
1,464,157
kWh
$4,990
569
kW-months/year
$2,760
-
$
$41,244
909,695
lb
$5,435
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes