Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2007 |
Principal Product | Pipeline Accessories |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3999 - Manufacturing Industries, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 32,000 |
Annual Production | 20,000 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $23,798 | 301,244 | kWh | $0.08 |
Electricity Demand | $5,385 | 6 | kW-months/year | $897.50 |
Electricity Fees | $1,600 | - | $ | - |
Natural Gas | $12,238 | 1,010 | MMBtu | $12.12 |
TOTAL ENERGY COSTS | $43,021 | |||
RECOMMENDED SAVINGS* | $5,964 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,051 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,971 Cost: $2,080 |
$1,869 | 23,655 | $102 | - | - | - | - | - |
$1,869 23,655 kWh |
$102 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $1,721 Cost: $150 |
$210 | 2,652 | $11 | - | - | - | $1,500 | - |
$210 2,652 kWh |
$11 - $ |
- - MMBtu |
$1,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $775 Cost: $438 |
- | - | - | - | $775 | 64 | - | - |
- - kWh |
- - $ |
$775 64 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $567 Cost: $825 |
$537 | 6,801 | $30 | - | - | - | - | - |
$537 6,801 kWh |
$30 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $437 Cost: $471 |
$414 | 5,245 | $23 | - | - | - | - | - |
$414 5,245 kWh |
$23 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $276 Cost: $90 |
$262 | 3,319 | $14 | - | - | - | - | - |
$262 3,319 kWh |
$14 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $170 Cost: $30 |
$161 | 2,035 | $9 | - | - | - | - | - |
$161 2,035 kWh |
$9 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $47 Cost: $183 |
$45 | 567 | $2 | - | - | - | - | - |
$45 567 kWh |
$2 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $5,964 Cost: $4,267 |
$3,498 | 44,274 | $191 | - | $775 | 64 | $1,500 | - | $3,498 44,274 kWh |
$191 - $ |
$775 64 MMBtu |
$1,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,051 Cost: $528 |
$262 | 3,319 | $14 | - | $775 | 64 | - | - | $262 3,319 kWh |
$14 - $ |
$775 64 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Fees | Natural Gas | One-time Revenue or Avoided Cost |