IAC logo
IAC Assessment: LM0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product scanners
NAICS n/a
SIC 3812 - Search And Navigation Equipment
Sales $10,000,000-$50,000,000
# of Employees 83
Plant Area (Sq.Ft.) 42,300
Annual Production 200 Pieces
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,215 437,280 kWh $0.07
Electricity Demand $6,632 1,212 kW-months/year $5.47
Electricity Fees $6,812 - $ -
TOTAL ENERGY COSTS $96,659
RECOMMENDED SAVINGS* $205,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,222
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$635
Cost:
$100
$293 5,952 $342 38 - - - - $293
5,952
kWh
$342
38
kW-months/year
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$587
Cost:
$115
$204 4,156 $383 21 - - - - $204
4,156
kWh
$383
21
kW-months/year
-
-
lb
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$25,900
Cost:
$12,500
- - - - $25,900 - - - -
-
kWh
-
-
kW-months/year
$25,900
-
lb
-
-
$
04: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$3,600
Cost:
-
- - - - - - $3,600 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,600
-
$
05: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$168,480
Cost:
$45,830
- - - - - - $168,480 - -
-
kWh
-
-
kW-months/year
-
-
lb
$168,480
-
$
06: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$6,000
Cost:
$5,000
- - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,000
-
$
TOTAL RECOMMENDED Savings:
$205,202
Cost:
$63,545
$497 10,108 $725 59 $25,900 - $178,080 - $497
10,108
kWh
$725
59
kW-months/year
$25,900
-
lb
$178,080
-
$
TOTAL IMPLEMENTED Savings:
$1,222
Cost:
$215
$497 10,108 $725 59 - - - - $497
10,108
kWh
$725
59
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes