Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2001 |
Principal Product | die castings |
NAICS | n/a |
SIC | 3544 - Special Dies, Tools, Jigs & Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 41,500 |
Annual Production | 1,500,000 Pieces |
Production Hrs. Annual | 2,184 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $110,804 | 2,260,850 | kWh | $0.05 |
Electricity Demand | $71,187 | 17,832 | kW-months/year | $3.99 |
Electricity Fees | $(-173,521) | - | $ | - |
Natural Gas | $29,839 | 11,562 | MMBtu | $2.58 |
TOTAL ENERGY COSTS | $38,309 | |||
RECOMMENDED SAVINGS* | $572,868 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $518,385 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,518 Cost: $500 |
$1,620 | 30,062 | $898 | 86 | - | - | - | - |
$1,620 30,062 kWh |
$898 86 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $44,725 Cost: $15,270 |
$29,272 | 543,084 | $15,453 | 1,492 | - | - | - | - |
$29,272 543,084 kWh |
$15,453 1,492 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $787 Cost: - |
$290 | 5,376 | $497 | 48 | - | - | - | - |
$290 5,376 kWh |
$497 48 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,758 Cost: $1,463 |
- | - | - | - | $9,758 | 1,314 | - | - |
- - kWh |
- - kW-months/year |
$9,758 1,314 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $36,000 Cost: $27,600 |
- | - | - | - | - | - | $36,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$36,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $146,432 Cost: $17,000 |
- | - | - | - | - | - | $146,432 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$146,432 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME |
Savings: $332,648 Cost: - |
- | - | - | - | - | - | $332,648 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$332,648 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $572,868 Cost: $61,833 |
$31,182 | 578,522 | $16,848 | 1,626 | $9,758 | 1,314 | $515,080 | - | $31,182 578,522 kWh |
$16,848 1,626 kW-months/year |
$9,758 1,314 MMBtu |
$515,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $518,385 Cost: $45,100 |
$1,910 | 35,438 | $1,395 | 134 | - | - | $515,080 | - | $1,910 35,438 kWh |
$1,395 134 kW-months/year |
- - MMBtu |
$515,080 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |