IAC logo
IAC Assessment: LM0016
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0016
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product stamped steel fasteners
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 250,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 5,904
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $431,405 6,884,012 kWh $0.06
Electricity Demand $185,141 28,632 kW-months/year $6.47
Electricity Fees $90,002 - $ -
Natural Gas $638,392 113,803 MMBtu $5.61
TOTAL ENERGY COSTS $1,344,940
RECOMMENDED SAVINGS* $1,905,125 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,826,311
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$9,494
Cost:
$2,500
$8,095 75,976 $1,399 155 - - - - - - $8,095
75,976
kWh
$1,399
155
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$50,600
Cost:
$60,000
- - - - $50,600 5,060 - - - - -
-
kWh
-
-
kW-months/year
$50,600
5,060
MMBtu
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,311
Cost:
$3,335
$3,677 34,508 $634 70 - - - - - - $3,677
34,508
kWh
$634
70
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$18,720
Cost:
$15,300
- - - - - - - - $18,720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$18,720
-
$
05: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$1,482,000
Cost:
$5,000
- - - - - - - - $1,482,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,482,000
-
$
06: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$340,000
Cost:
$310,000
- - - - - - $340,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$340,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,905,125
Cost:
$396,135
$11,772 110,484 $2,033 225 $50,600 5,060 $340,000 - $1,500,720 - $11,772
110,484
kWh
$2,033
225
kW-months/year
$50,600
5,060
MMBtu
$340,000
-
$
$1,500,720
-
$
TOTAL IMPLEMENTED Savings:
$1,826,311
Cost:
$318,335
$3,677 34,508 $634 70 - - $340,000 - $1,482,000 - $3,677
34,508
kWh
$634
70
kW-months/year
-
-
MMBtu
$340,000
-
$
$1,482,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes