IAC logo
IAC Assessment: LM0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product compressed gas cylinders
NAICS n/a
SIC 3463 - Nonferrous Forgings
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 74,000
Annual Production 590,000 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $172,336 2,814,294 kWh $0.06
Electricity Demand $107,512 8,844 kW-months/year $12.16
Electricity Fees $5,976 - $ -
Natural Gas $164,633 29,887 MMBtu $5.51
TOTAL ENERGY COSTS $450,457
RECOMMENDED SAVINGS* $55,410 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,524
#|Description Savings
Cost
Status Natural Gas Personnel Changes Administrative Changes Increase in Production Natural Gas Personnel Changes Administrative Changes Increase in Production
$ MMBtu $ $ $ $ $ %
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,902
Cost:
$8,000
$8,902 1,108 - - - - - - $8,902
1,108
MMBtu
-
-
$
-
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$724
Cost:
$350
$1,504 201 $(-780) - - - - - $1,504
201
MMBtu
$(-780)
-
$
-
-
$
-
-
%
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,910
Cost:
$11,800
- - - - $5,910 - - - -
-
MMBtu
-
-
$
$5,910
-
$
-
-
%
04: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$7,800
Cost:
$2,250
- - $7,800 - - - - - -
-
MMBtu
$7,800
-
$
-
-
$
-
-
%
05: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$30,900
Cost:
$8,000
- - - - - - $30,900 - -
-
MMBtu
-
-
$
-
-
$
$30,900
-
%
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,174
Cost:
$500
- - - - - - $1,174 - -
-
MMBtu
-
-
$
-
-
$
$1,174
-
%
TOTAL RECOMMENDED Savings:
$55,410
Cost:
$30,900
$10,406 1,309 $7,020 - $5,910 - $32,074 - $10,406
1,309
MMBtu
$7,020
-
$
$5,910
-
$
$32,074
-
%
TOTAL IMPLEMENTED Savings:
$8,524
Cost:
$2,600
$1,504 201 $7,020 - - - - - $1,504
201
MMBtu
$7,020
-
$
-
-
$
-
-
%
Savings
Cost
$ MMBtu $ $ $ $ $ %
Natural Gas Personnel Changes Administrative Changes Increase in Production Natural Gas Personnel Changes Administrative Changes Increase in Production