IAC logo
IAC Assessment: LM0029
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0029
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product metal stampings
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 640,000
Annual Production 60,000,000 Pieces
Production Hrs. Annual 2,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,256 946,320 kWh $0.09
Electricity Demand $30,497 3,811 kW-months/year $8.00
Electricity Fees $2,301 - $ -
TOTAL ENERGY COSTS $122,054
RECOMMENDED SAVINGS* $737,399 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,538
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$592
Cost:
$735
$437 3,413 $155 20 - - - - - - $437
3,413
kWh
$155
20
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,200
Cost:
-
$913 7,115 $287 38 - - - - - - $913
7,115
kWh
$287
38
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,118
Cost:
$500
$11,730 91,444 $3,688 487 $(-300) - - - - - $11,730
91,444
kWh
$3,688
487
kW-months/year
$(-300)
-
$
-
-
$
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,628
Cost:
$700
$5,656 44,089 $1,972 264 - - - - - - $5,656
44,089
kWh
$1,972
264
kW-months/year
-
-
$
-
-
$
-
-
$
05: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$200,000
Cost:
$163,000
- - - - - - $200,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$200,000
-
$
-
-
$
06: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$40,500
Cost:
$7,960
- - - - - - - - $40,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$40,500
-
$
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$45,000
Cost:
$16,500
- - - - $45,000 - - - - - -
-
kWh
-
-
kW-months/year
$45,000
-
$
-
-
$
-
-
$
08: 4.426 MODIFY WORKLOAD Savings:
$247,361
Cost:
$15,000
- - - - - - $247,361 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$247,361
-
$
-
-
$
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$165,000
Cost:
$350,000
- - - - $165,000 - - - - - -
-
kWh
-
-
kW-months/year
$165,000
-
$
-
-
$
-
-
$
10: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$7,500
Cost:
$1,000
- - - - - - $7,500 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,500
-
$
-
-
$
11: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$7,500
Cost:
$1,000
- - - - - - $7,500 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$7,500
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$737,399
Cost:
$556,395
$18,736 146,061 $6,102 809 $209,700 - $462,361 - $40,500 - $18,736
146,061
kWh
$6,102
809
kW-months/year
$209,700
-
$
$462,361
-
$
$40,500
-
$
TOTAL IMPLEMENTED Savings:
$39,538
Cost:
$3,935
$18,736 146,061 $6,102 809 $(-300) - $15,000 - - - $18,736
146,061
kWh
$6,102
809
kW-months/year
$(-300)
-
$
$15,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Product