IAC logo
IAC Assessment: LM0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product knitted, dyed and printed fabrics
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 150,000
Annual Production 22,072,309 Pounds
Production Hrs. Annual 5,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,949 11,333,467 kWh $0.05
Electricity Demand $245,797 26,184 kW-months/year $9.39
Electricity Fees $11,605 - $ -
Natural Gas $980,672 270,905 MMBtu $3.62
TOTAL ENERGY COSTS $1,780,023
RECOMMENDED SAVINGS* $50,237 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,225
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$6,786
Cost:
$7,274
$5,764 119,197 $1,022 214 - - - - $5,764
119,197
kWh
$1,022
214
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,174
Cost:
$250
$4,811 99,850 $1,143 20 - - $(-780) - $4,811
99,850
kWh
$1,143
20
kW-months/year
-
-
MMBtu
$(-780)
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,012
Cost:
$18,500
- - - - $12,012 2,755 - - -
-
kWh
-
-
kW-months/year
$12,012
2,755
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,265
Cost:
$2,028
- - - - $6,265 1,437 - - -
-
kWh
-
-
kW-months/year
$6,265
1,437
MMBtu
-
-
$
05: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$20,000
Cost:
$19,260
- - - - - - $20,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,000
-
$
TOTAL RECOMMENDED Savings:
$50,237
Cost:
$47,312
$10,575 219,047 $2,165 234 $18,277 4,192 $19,220 - $10,575
219,047
kWh
$2,165
234
kW-months/year
$18,277
4,192
MMBtu
$19,220
-
$
TOTAL IMPLEMENTED Savings:
$18,225
Cost:
$9,552
$10,575 219,047 $2,165 234 $6,265 1,437 $(-780) - $10,575
219,047
kWh
$2,165
234
kW-months/year
$6,265
1,437
MMBtu
$(-780)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes