Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2004
Principal Product plastics vacuum formed
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 21
Plant Area (Sq.Ft.) 47,000
Annual Production 420,000 Pounds
Production Hrs. Annual 2,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,205 852,310 kWh $0.05
Electricity Demand $21,603 8,376 kW-months/year $2.58
Electricity Fees $6,451 - $ -
Natural Gas $18,570 2,513 MMBtu $7.39
TOTAL ENERGY COSTS $89,829
RECOMMENDED SAVINGS* $25,097 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,448
Cost:
$410
$3,494 70,458 $954 370 - - - - - - $3,494
70,458
kWh
$954
370
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING Savings:
$846
Cost:
$30
$665 13,182 $181 71 - - - - - - $665
13,182
kWh
$181
71
kW-months/year
-
-
$
-
-
$
-
-
$
03: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$5,758
Cost:
$8,250
- - - - $5,758 - - - - - -
-
kWh
-
-
kW-months/year
$5,758
-
$
-
-
$
-
-
$
04: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$13,000
Cost:
$3,122
- - - - - - - - $13,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$13,000
-
$
05: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$1,045
Cost:
-
- - - - - - $1,045 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,045
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,097
Cost:
$11,812
$4,159 83,640 $1,135 441 $5,758 - $1,045 - $13,000 - $4,159
83,640
kWh
$1,135
441
kW-months/year
$5,758
-
$
$1,045
-
$
$13,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost