IAC logo
IAC Assessment: LM0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2005
Principal Product PVC cement
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 4,576
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,116 2,002,199 kWh $0.10
Electricity Demand $66,319 629 kW-months/year $105.44
Electricity Fees $11,065 - $ -
Natural Gas $1,070 88 MMBtu $12.16
TOTAL ENERGY COSTS $288,570
RECOMMENDED SAVINGS* $38,468 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,607
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,607
Cost:
$475
$1,316 12,768 $291 34 - - $1,316
12,768
kWh
$291
34
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,940
Cost:
-
$1,591 15,440 $349 41 - - $1,591
15,440
kWh
$349
41
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$903
Cost:
$200
$740 7,178 $163 19 - - $740
7,178
kWh
$163
19
kW-months/year
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,570
Cost:
$150
$1,441 13,985 $129 14 - - $1,441
13,985
kWh
$129
14
kW-months/year
-
-
$
05: 4.426 MODIFY WORKLOAD Savings:
$32,448
Cost:
$300
- - - - $32,448 - -
-
kWh
-
-
kW-months/year
$32,448
-
$
TOTAL RECOMMENDED Savings:
$38,468
Cost:
$1,125
$5,088 49,371 $932 108 $32,448 - $5,088
49,371
kWh
$932
108
kW-months/year
$32,448
-
$
TOTAL IMPLEMENTED Savings:
$1,607
Cost:
$475
$1,316 12,768 $291 34 - - $1,316
12,768
kWh
$291
34
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes