IAC logo
IAC Assessment: LM0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2005
Principal Product aerospace parts
NAICS 336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
SIC 3769 - Space Vehicle Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 46,500
Annual Production 150 Pieces
Production Hrs. Annual 5,066
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,875 1,816,509 kWh $0.11
Electricity Demand $24,705 4,572 kW-months/year $5.40
Electricity Fees $12,489 - $ -
TOTAL ENERGY COSTS $234,069
RECOMMENDED SAVINGS* $1,714,972 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,264,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,202
Cost:
$500
$1,074 9,526 $128 23 - - $1,074
9,526
kWh
$128
23
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,058
Cost:
$1,000
$1,839 16,302 $219 38 - - $1,839
16,302
kWh
$219
38
kW-months/year
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,712
Cost:
$200
$3,288 29,148 $424 75 - - $3,288
29,148
kWh
$424
75
kW-months/year
-
-
$
04: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$450,000
Cost:
$15,000
- - - - $450,000 - -
-
kWh
-
-
kW-months/year
$450,000
-
$
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,258,000
Cost:
$1,250,000
- - - - $1,258,000 - -
-
kWh
-
-
kW-months/year
$1,258,000
-
$
TOTAL RECOMMENDED Savings:
$1,714,972
Cost:
$1,266,700
$6,201 54,976 $771 136 $1,708,000 - $6,201
54,976
kWh
$771
136
kW-months/year
$1,708,000
-
$
TOTAL IMPLEMENTED Savings:
$1,264,972
Cost:
$1,251,700
$6,201 54,976 $771 136 $1,258,000 - $6,201
54,976
kWh
$771
136
kW-months/year
$1,258,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product