IAC logo
IAC Assessment: LM0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2007
Principal Product aluminum die castings
NAICS 331523 - Nonferrous Metal Die-Casting Foundries
SIC 3363 - Aluminum Die-castings
Sales $5,000,000-$10,000,000
# of Employees 42
Plant Area (Sq.Ft.) 50,000
Annual Production 2,470,000 Pounds
Production Hrs. Annual 4,446
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,387 1,534,031 kWh $0.08
Electricity Demand $75,574 6,731 kW-months/year $11.23
Electricity Fees $26,954 - $ -
Natural Gas $112,216 12,035 MMBtu $9.32
TOTAL ENERGY COSTS $340,131
RECOMMENDED SAVINGS* $255,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $238,523
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$7,858
Cost:
$2,500
- - - - $3,029 345 $4,829 - - - -
-
kWh
-
-
kW-months/year
$3,029
345
MMBtu
$4,829
-
$
-
-
%
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,223
Cost:
$1,300
$1,790 17,363 $433 47 - - - - - - $1,790
17,363
kWh
$433
47
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$151,200
Cost:
$2,000
- - - - - - - - $151,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$151,200
-
%
04: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$15,120
Cost:
$1,400
$263 3,300 $160 14 - - - - $14,697 - $263
3,300
kWh
$160
14
kW-months/year
-
-
MMBtu
-
-
$
$14,697
-
%
05: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$44,787
Cost:
$1,000
$1,436 18,000 - - $1,892 172 $41,459 - - - $1,436
18,000
kWh
-
-
kW-months/year
$1,892
172
MMBtu
$41,459
-
$
-
-
%
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$34,678
Cost:
$2,000
$658 8,250 - - - - - - $34,020 - $658
8,250
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$34,020
-
%
TOTAL RECOMMENDED Savings:
$255,866
Cost:
$10,200
$4,147 46,913 $593 61 $4,921 517 $46,288 - $199,917 - $4,147
46,913
kWh
$593
61
kW-months/year
$4,921
517
MMBtu
$46,288
-
$
$199,917
-
%
TOTAL IMPLEMENTED Savings:
$238,523
Cost:
$7,500
$2,094 26,250 - - $4,921 517 $46,288 - $185,220 - $2,094
26,250
kWh
-
-
kW-months/year
$4,921
517
MMBtu
$46,288
-
$
$185,220
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production Electricity Usage Electricity Demand Natural Gas Primary Raw Material Increase in Production