IAC logo
IAC Assessment: LS0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2017
Principal Product Amines
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $100,000,000-$500,000,000
# of Employees 107
Plant Area (Sq.Ft.) 2,861,032
Annual Production 285,000,000 Units
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,390,190 31,867,600 kWh $0.04
Electricity Demand $432,228 56,208 kW-months/year $7.69
Natural Gas $2,486,844 746,800 MMBtu $3.33
TOTAL ENERGY COSTS $4,309,262
RECOMMENDED SAVINGS* $256,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,204
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$69,401
Cost:
$106,209
- - - - $69,401 - - - -
-
kWh
-
-
kW-months/year
$69,401
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,903
Cost:
$21,300
$25,903 637,858 - - - - - - $25,903
637,858
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,795
Cost:
$4,000
$4,795 118,075 - - - - - - $4,795
118,075
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,832
Cost:
$100
- - - - - - $7,832 2,352 -
-
kWh
-
-
kW-months/year
-
-
$
$7,832
2,352
MMBtu
05: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$134,326
Cost:
$621,739
- - - - - - $134,326 40,705 -
-
kWh
-
-
kW-months/year
-
-
$
$134,326
40,705
MMBtu
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$7,044
Cost:
$34,056
$7,044 176,090 - - - - - - $7,044
176,090
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,997
Cost:
$3,280
$5,635 140,883 $1,362 177 - - - - $5,635
140,883
kWh
$1,362
177
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$330
Cost:
$400
$330 8,238 - - - - - - $330
8,238
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$347
Cost:
$585
$347 8,665 - - - - - - $347
8,665
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$256,975
Cost:
$791,669
$44,054 1,089,809 $1,362 177 $69,401 - $142,158 43,057 $44,054
1,089,809
kWh
$1,362
177
kW-months/year
$69,401
-
$
$142,158
43,057
MMBtu
TOTAL IMPLEMENTED Savings:
$46,204
Cost:
$29,665
$37,010 913,719 $1,362 177 - - $7,832 2,352 $37,010
913,719
kWh
$1,362
177
kW-months/year
-
-
$
$7,832
2,352
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas