IAC logo
IAC Assessment: LS0922
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS0922
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2022
Principal Product General Warehousing and Storage
NAICS 493110 - General Warehousing and Storage
SIC 4225 - General Warehousing And Storage
Sales <$500,000
# of Employees 24
Plant Area (Sq.Ft.) 189,790
Annual Production 1 Units
Production Hrs. Annual 2,210
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,864 97,998 kWh $0.12
Electricity Demand $1,145 241 kW-months/year $4.75
TOTAL ENERGY COSTS $13,009
RECOMMENDED SAVINGS* $44,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,984
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Primary Raw Material One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,611
Cost:
$150
$1,611 13,296 - - - - - - $1,611
13,296
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$9,984
Cost:
$2,336
- - - - $9,984 - - - -
-
kWh
-
-
kW-months/year
$9,984
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$740
Cost:
$375
$740 6,107 - - - - - - $740
6,107
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,130
Cost:
$2,550
$1,756 14,489 $374 79 - - - - $1,756
14,489
kWh
$374
79
kW-months/year
-
-
$
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$15
Cost:
$55
$15 123 - - - - - - $15
123
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 4.811 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$30,504
Cost:
$117,252
- - - - - - $30,504 - -
-
kWh
-
-
kW-months/year
-
-
$
$30,504
-
$
TOTAL RECOMMENDED Savings:
$44,984
Cost:
$122,718
$4,122 34,015 $374 79 $9,984 - $30,504 - $4,122
34,015
kWh
$374
79
kW-months/year
$9,984
-
$
$30,504
-
$
TOTAL IMPLEMENTED Savings:
$44,984
Cost:
$122,718
$4,122 34,015 $374 79 $9,984 - $30,504 - $4,122
34,015
kWh
$374
79
kW-months/year
$9,984
-
$
$30,504
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Primary Raw Material One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Primary Raw Material One-time Revenue or Avoided Cost