IAC logo
IAC Assessment: LS1022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS1022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2022
Principal Product Petroleum Bulk Stations and Terminals
NAICS 424710 - Petroleum Bulk Stations and Terminals
SIC 5171 - Petroleum Bulk Stations & Terminals
Sales <$500,000
# of Employees 30
Plant Area (Sq.Ft.) 973,000
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,924 1,540,600 kWh $0.08
Electricity Demand $23,299 5,652 kW-months/year $4.12
Natural Gas $356,621 71,882 MMBtu $4.96
TOTAL ENERGY COSTS $500,844
RECOMMENDED SAVINGS* $373,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $369,773
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$1,456
Cost:
-
- - - - - - $1,456 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,456
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,565
Cost:
$88
$1,565 19,937 - - - - - - - - $1,565
19,937
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,360
Cost:
$270
$2,360 30,064 - - - - - - - - $2,360
30,064
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$248
Cost:
$50
$248 3,154 - - - - - - - - $248
3,154
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,202
Cost:
$12,065
$19,749 251,610 $2,453 595 - - - - - - $19,749
251,610
kWh
$2,453
595
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$71,544
Cost:
$66,750
$71,544 911,481 - - - - - - - - $71,544
911,481
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$84,344
Cost:
$218,400
- - - - $84,344 17,001 - - - - -
-
kWh
-
-
kW-months/year
$84,344
17,001
MMBtu
-
-
$
-
-
$
08: 2.1224 REPLACE BOILER Savings:
$186,054
Cost:
$504,000
- - - - $186,054 37,502 - - - - -
-
kWh
-
-
kW-months/year
$186,054
37,502
MMBtu
-
-
$
-
-
$
09: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$3,599
Cost:
$16,545
- - - - - - - - $3,599 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,599
-
$
TOTAL RECOMMENDED Savings:
$373,372
Cost:
$818,168
$95,466 1,216,246 $2,453 595 $270,398 54,503 $1,456 - $3,599 - $95,466
1,216,246
kWh
$2,453
595
kW-months/year
$270,398
54,503
MMBtu
$1,456
-
$
$3,599
-
$
TOTAL IMPLEMENTED Savings:
$369,773
Cost:
$801,623
$95,466 1,216,246 $2,453 595 $270,398 54,503 $1,456 - - - $95,466
1,216,246
kWh
$2,453
595
kW-months/year
$270,398
54,503
MMBtu
$1,456
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes