Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2018 |
Principal Product | Beer |
NAICS | 312120 - Breweries |
SIC | 2082 - Malt Beverages |
Sales | $1,000,000-$5,000,000 |
# of Employees | 15 |
Plant Area (Sq.Ft.) | 32,000 |
Annual Production | 310 Thousand Gallons |
Production Hrs. Annual | 2,860 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $20,884 | 269,640 | kWh | $0.08 |
Electricity Demand | $3,329 | 808 | kW-months/year | $4.12 |
Natural Gas | $9,745 | 1,412 | MMBtu | $6.90 |
LPG | $32,000 | 6,400 | MMBtu | $5.00 |
Fuel Oil #2 | $25,000 | 5,000 | MMBtu | $5.00 |
Other Energy | $5,000 | 1,000 | MMBtu | $5.00 |
TOTAL ENERGY COSTS | $95,958 | |||
RECOMMENDED SAVINGS* | $3,838 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,489 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $459 Cost: $25 |
- | - | - | - | $459 | - |
- - kWh |
- - kW-months/year |
$459 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,369 Cost: $350 |
$1,369 | 18,503 | - | - | - | - |
$1,369 18,503 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $73 Cost: $25 |
$73 | 977 | - | - | - | - |
$73 977 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $146 Cost: $125 |
$146 | 1,965 | - | - | - | - |
$146 1,965 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $15 Cost: $100 |
$15 | 200 | - | - | - | - |
$15 200 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,427 Cost: $3,000 |
$1,158 | 15,558 | $269 | 60 | - | - |
$1,158 15,558 kWh |
$269 60 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $88 Cost: $225 |
$88 | 1,190 | - | - | - | - |
$88 1,190 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $261 Cost: $788 |
$261 | 3,510 | - | - | - | - |
$261 3,510 kWh |
- - kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,838 Cost: $4,638 |
$3,110 | 41,903 | $269 | 60 | $459 | - | $3,110 41,903 kWh |
$269 60 kW-months/year |
$459 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,489 Cost: $3,625 |
$2,761 | 37,203 | $269 | 60 | $459 | - | $2,761 37,203 kWh |
$269 60 kW-months/year |
$459 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes |