IAC Assessment: LS1901
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2019
Principal Product Oil and Gas Field Machinery Equipment
NAICS 333132 - Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 77,400
Annual Production 6,300 Units
Production Hrs. Annual 3,120
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,976 689,500 kWh $0.10
Other Gas $51,600 7,000 MMBtu $7.37
TOTAL ENERGY COSTS $118,576
RECOMMENDED SAVINGS* $63,174 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,571
#|Description Savings
Cost
Status Electricity Usage Increase in Production Electricity Usage Increase in Production
$ kWh $ %
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$374
Cost:
$25
$374 3,851 - - $374
3,851
kWh
-
-
%
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,421
Cost:
$50
$1,421 14,648 - - $1,421
14,648
kWh
-
-
%
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$483
Cost:
$75
$483 4,980 - - $483
4,980
kWh
-
-
%
04: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$1,150
Cost:
$100
$1,150 11,836 - - $1,150
11,836
kWh
-
-
%
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$45,500
Cost:
$27,000
- - $45,500 - -
-
kWh
$45,500
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,246
Cost:
$21,652
$14,246 146,871 - - $14,246
146,871
kWh
-
-
%
TOTAL RECOMMENDED Savings:
$63,174
Cost:
$48,902
$17,674 182,186 $45,500 - $17,674
182,186
kWh
$45,500
-
%
TOTAL IMPLEMENTED Savings:
$2,571
Cost:
$150
$2,571 26,484 - - $2,571
26,484
kWh
-
-
%
Savings
Cost
$ kWh $ %
Electricity Usage Increase in Production Electricity Usage Increase in Production