IAC logo
IAC Assessment: LS1906
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS1906
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2019
Principal Product Laundry
NAICS 812332 - Industrial Launderers
SIC 7218 - Industrial Launderers
Sales $10,000,000-$50,000,000
# of Employees 255
Plant Area (Sq.Ft.) 175,000
Annual Production 42,000,000 Pounds
Production Hrs. Annual 7,525
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $336,821 3,544,880 kWh $0.10
Natural Gas $287,501 68,848 MMBtu $4.18
TOTAL ENERGY COSTS $624,322
RECOMMENDED SAVINGS* $250,375 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,228
Cost:
$50
$2,228 23,454 - - - - $2,228
23,454
kWh
-
-
MMBtu
-
-
$
02: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$3,667
Cost:
$315
$3,667 38,591 - - - - $3,667
38,591
kWh
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,895
Cost:
$1,125
$3,895 41,001 - - - - $3,895
41,001
kWh
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,705
Cost:
$15,900
$53,705 565,225 - - - - $53,705
565,225
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,230
Cost:
$16,552
$41,230 434,005 - - - - $41,230
434,005
kWh
-
-
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$44
Cost:
$40
$44 464 - - - - $44
464
kWh
-
-
MMBtu
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$145,606
Cost:
$704,000
$314,598 3,311,000 $77,773 18,624 $(-246,765) - $314,598
3,311,000
kWh
$77,773
18,624
MMBtu
$(-246,765)
-
$
TOTAL RECOMMENDED Savings:
$250,375
Cost:
$737,982
$419,367 4,413,740 $77,773 18,624 $(-246,765) - $419,367
4,413,740
kWh
$77,773
18,624
MMBtu
$(-246,765)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes