IAC logo
IAC Assessment: LS1911
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS1911
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2019
Principal Product Wastewater/Sewage Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 15
Plant Area (Sq.Ft.) 4,356,000
Annual Production 3,650,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $418,384 6,255,200 kWh $0.07
Natural Gas $56,668 5,437 MMBtu $10.42
TOTAL ENERGY COSTS $475,052
RECOMMENDED SAVINGS* $71,218 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$651
Cost:
$25
$651 9,729 $651
9,729
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,381
Cost:
$174
$2,381 35,592 $2,381
35,592
kWh
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,929
Cost:
$325
$1,929 28,843 $1,929
28,843
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,832
Cost:
$1,736
$6,832 102,142 $6,832
102,142
kWh
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,758
Cost:
$500
$1,758 26,280 $1,758
26,280
kWh
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$40,165
Cost:
$22,200
$40,165 600,498 $40,165
600,498
kWh
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,502
Cost:
$12,000
$17,502 261,675 $17,502
261,675
kWh
TOTAL RECOMMENDED Savings:
$71,218
Cost:
$36,960
$71,218 1,064,759 $71,218
1,064,759
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage