IAC logo
IAC Assessment: LS1915
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS1915
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2019
Principal Product Canned Food Products
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 22,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 2,600
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,076 456,267 kWh $0.07
Electricity Demand $7,676 1,863 kW-months/year $4.12
Natural Gas $53,160 10,823 MMBtu $4.91
TOTAL ENERGY COSTS $91,912
RECOMMENDED SAVINGS* $8,921 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,228
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$310
Cost:
$33
$310 4,550 - - - - $310
4,550
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$99
Cost:
$25
$99 1,460 - - - - $99
1,460
kWh
-
-
kW-months/year
-
-
MMBtu
03: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$607
Cost:
$450
$607 8,915 - - - - $607
8,915
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,228
Cost:
$1,974
$979 14,380 $249 60 - - $979
14,380
kWh
$249
60
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,568
Cost:
$12,000
- - - - $6,568 1,337 -
-
kWh
-
-
kW-months/year
$6,568
1,337
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$109
Cost:
$258
$109 1,605 - - - - $109
1,605
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,921
Cost:
$14,740
$2,104 30,910 $249 60 $6,568 1,337 $2,104
30,910
kWh
$249
60
kW-months/year
$6,568
1,337
MMBtu
TOTAL IMPLEMENTED Savings:
$1,228
Cost:
$1,974
$979 14,380 $249 60 - - $979
14,380
kWh
$249
60
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas