IAC logo
IAC Assessment: LS2114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2021
Principal Product Ready Mix Concrete
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 24
Plant Area (Sq.Ft.) 238,000
Annual Production 120,000 Units
Production Hrs. Annual 3,744
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,922 430,120 kWh $0.12
Fuel Oil #2 $418,000 168,658 MMBtu $2.48
TOTAL ENERGY COSTS $467,922
RECOMMENDED SAVINGS* $7,405 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,366
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$495
Cost:
$25
$495 4,264 $495
4,264
kWh
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,312
Cost:
$113
$1,312 11,309 $1,312
11,309
kWh
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,124
Cost:
$270
$3,124 26,935 $3,124
26,935
kWh
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$813
Cost:
$148
$813 7,008 $813
7,008
kWh
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$423
Cost:
$155
$423 3,650 $423
3,650
kWh
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,117
Cost:
$473
$1,117 9,626 $1,117
9,626
kWh
07: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$66
Cost:
$50
$66 573 $66
573
kWh
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$55
Cost:
$102
$55 476 $55
476
kWh
TOTAL RECOMMENDED Savings:
$7,405
Cost:
$1,336
$7,405 63,841 $7,405
63,841
kWh
TOTAL IMPLEMENTED Savings:
$6,366
Cost:
$1,004
$6,366 54,878 $6,366
54,878
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage