Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2022 |
Principal Product | Agricultural Equipment |
NAICS | 333111 - Farm Machinery and Equipment Manufacturing |
SIC | 3523 - Farm Machinery And Equipment |
Sales | $50,000,000-$100,000,000 |
# of Employees | 311 |
Plant Area (Sq.Ft.) | 650,000 |
Annual Production | 400 Units |
Production Hrs. Annual | 2,470 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $711,429 | 7,113,063 | kWh | $0.10 |
Natural Gas | $88,840 | 16,401 | MMBtu | $5.42 |
TOTAL ENERGY COSTS | $800,269 | |||
RECOMMENDED SAVINGS* | $183,193 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,738 |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Administrative Changes | Primary Raw Material | Electricity Usage | Personnel Changes | Administrative Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $21,720 Cost: - |
- | - | - | - | $21,720 | - | - | - |
- - kWh |
- - $ |
$21,720 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,196 Cost: $100 |
$3,196 | 31,954 | - | - | - | - | - | - |
$3,196 31,954 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $535 Cost: $90 |
$535 | 5,350 | - | - | - | - | - | - |
$535 5,350 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS |
Savings: $12,800 Cost: $2,600 |
- | - | - | - | $12,800 | - | - | - |
- - kWh |
- - $ |
$12,800 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,084 Cost: $800 |
$1,084 | 10,842 | - | - | - | - | - | - |
$1,084 10,842 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $11,310 Cost: $17,640 |
$(-7,410) | (-74,100) | $18,720 | - | - | - | - | - |
$(-7,410) (-74,100) kWh |
$18,720 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,287 Cost: $38,480 |
$15,287 | 152,873 | - | - | - | - | - | - |
$15,287 152,873 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $78,203 Cost: $201,075 |
$8,003 | 80,028 | $70,200 | - | - | - | - | - |
$8,003 80,028 kWh |
$70,200 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS |
Savings: $1,482 Cost: $4,700 |
$1,482 | 14,820 | - | - | - | - | - | - |
$1,482 14,820 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.2173 CONVERT TO ROBOTIC PAINTING |
Savings: $37,576 Cost: $140,000 |
- | - | - | - | - | - | $37,576 | - |
- - kWh |
- - $ |
- - $ |
$37,576 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $183,193 Cost: $405,485 |
$22,177 | 221,767 | $88,920 | - | $34,520 | - | $37,576 | - | $22,177 221,767 kWh |
$88,920 - $ |
$34,520 - $ |
$37,576 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,738 Cost: $38,670 |
$19,018 | 190,177 | - | - | $21,720 | - | - | - | $19,018 190,177 kWh |
- - $ |
$21,720 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Administrative Changes | Primary Raw Material | Electricity Usage | Personnel Changes | Administrative Changes | Primary Raw Material |