IAC logo
IAC Assessment: LS2219
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2219
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2022
Principal Product Pepper Sauce
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 329,000
Annual Production 14,000,000 Units
Production Hrs. Annual 5,720
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $275,330 3,703,000 kWh $0.07
Electricity Demand $39,510 9,588 kW-months/year $4.12
TOTAL ENERGY COSTS $314,840
RECOMMENDED SAVINGS* $37,025 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,065
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Increase in Production Electricity Usage Electricity Demand Increase in Production
$ kWh $ kW-months/year $ %
01: 4.642 INSTALL SENSORS TO DETECT AND AVOID JAMS Savings:
$35,000
Cost:
$7,400
- - - - $35,000 - -
-
kWh
-
-
kW-months/year
$35,000
-
%
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$679
Cost:
$150
$679 9,176 - - - - $679
9,176
kWh
-
-
kW-months/year
-
-
%
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$389
Cost:
$225
$389 5,259 - - - - $389
5,259
kWh
-
-
kW-months/year
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$676
Cost:
$1,121
$556 7,518 $120 29 - - $556
7,518
kWh
$120
29
kW-months/year
-
-
%
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$281
Cost:
$740
$281 3,784 - - - - $281
3,784
kWh
-
-
kW-months/year
-
-
%
TOTAL RECOMMENDED Savings:
$37,025
Cost:
$9,636
$1,905 25,737 $120 29 $35,000 - $1,905
25,737
kWh
$120
29
kW-months/year
$35,000
-
%
TOTAL IMPLEMENTED Savings:
$1,065
Cost:
$1,346
$945 12,777 $120 29 - - $945
12,777
kWh
$120
29
kW-months/year
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ %
Electricity Usage Electricity Demand Increase in Production Electricity Usage Electricity Demand Increase in Production