IAC logo
IAC Assessment: LS2302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2023
Principal Product Meat Seasoning
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 256,140
Annual Production 17,000,000 Pounds
Production Hrs. Annual 3,510
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $446,839 4,453,000 kWh $0.10
TOTAL ENERGY COSTS $469,471
RECOMMENDED SAVINGS* $62,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,787
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$16,597
Cost:
-
- - $16,597 234,000 -
-
kWh
$16,597
234,000
lb
02: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$594
Cost:
-
- - $594 1,040 -
-
kWh
$594
1,040
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,984
Cost:
$325
$2,984 29,843 - - $2,984
29,843
kWh
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$819
Cost:
$90
$819 8,192 - - $819
8,192
kWh
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$210
Cost:
$25
$210 2,097 - - $210
2,097
kWh
-
-
lb
06: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$8,863
Cost:
$5,000
$8,863 88,633 - - $8,863
88,633
kWh
-
-
lb
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,715
Cost:
$3,600
$5,715 57,150 - - $5,715
57,150
kWh
-
-
lb
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,803
Cost:
$19,030
$17,803 178,028 - - $17,803
178,028
kWh
-
-
lb
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,895
Cost:
$12,150
$8,895 88,950 - - $8,895
88,950
kWh
-
-
lb
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$194
Cost:
$700
$194 1,944 - - $194
1,944
kWh
-
-
lb
TOTAL RECOMMENDED Savings:
$62,674
Cost:
$40,920
$45,483 454,837 $17,191 235,040 $45,483
454,837
kWh
$17,191
235,040
lb
TOTAL IMPLEMENTED Savings:
$20,787
Cost:
$19,355
$20,787 207,871 - - $20,787
207,871
kWh
-
-
lb