IAC logo
IAC Assessment: LS2316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2023
Principal Product Industrial Services
NAICS 332410 - Power Boiler and Heat Exchanger Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 160,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,420
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,310 2,120,880 kWh $0.11
Electricity Demand $16,534 4,605 kW-months/year $3.59
TOTAL ENERGY COSTS $243,844
RECOMMENDED SAVINGS* $87,475 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,030
Cost:
$30
$3,030 28,315 - - $3,030
28,315
kWh
-
-
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,894
Cost:
$135
$1,894 17,699 - - $1,894
17,699
kWh
-
-
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,726
Cost:
$4,515
$30,911 288,891 $2,815 784 $30,911
288,891
kWh
$2,815
784
kW-months/year
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,069
Cost:
$370
$1,069 9,987 - - $1,069
9,987
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,296
Cost:
$25,200
$47,296 442,016 - - $47,296
442,016
kWh
-
-
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$460
Cost:
$753
$460 4,297 - - $460
4,297
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$87,475
Cost:
$31,003
$84,660 791,205 $2,815 784 $84,660
791,205
kWh
$2,815
784
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand