IAC logo
IAC Assessment: LS2404
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2024
Principal Product Industrial Valves
NAICS 332911 - Industrial Valve Manufacturing
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 257,240
Annual Production 4,000 Units
Production Hrs. Annual 3,210
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,040 1,469,500 kWh $0.10
Electricity Demand $27,073 6,568 kW-months/year $4.12
TOTAL ENERGY COSTS $170,113
RECOMMENDED SAVINGS* $22,279 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,988
Cost:
$275
$5,988 61,731 - - $5,988
61,731
kWh
-
-
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,008
Cost:
$75
$1,008 10,387 - - $1,008
10,387
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,054
Cost:
$135
$1,054 10,865 - - $1,054
10,865
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,771
Cost:
$3,080
$3,771 38,873 - - $3,771
38,873
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,458
Cost:
$11,138
$8,991 92,688 $1,467 356 $8,991
92,688
kWh
$1,467
356
kW-months/year
TOTAL RECOMMENDED Savings:
$22,279
Cost:
$14,703
$20,812 214,544 $1,467 356 $20,812
214,544
kWh
$1,467
356
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand