Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana State University |
---|---|
Assessment Year | 2024 |
Principal Product | Rope |
NAICS | 314994 - Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills |
SIC | 2298 - Cordage And Twine |
Sales | $50,000,000-$100,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $180,920 | 2,071,920 | kWh | $0.09 |
TOTAL ENERGY COSTS | $182,880 | |||
RECOMMENDED SAVINGS* | $159,615 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Usage | Water Disposal | Ancillary Material Cost | Increase in Production | Electricity Usage | Water Usage | Water Disposal | Ancillary Material Cost | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | Tgal | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $6,299 Cost: $17,640 |
$6,299 | 72,402 | - | - | - | - | - | - | - | - |
$6,299 72,402 kWh |
- - Tgal |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.3133 USE OTHER WASTE CONCENTRATION METHODS |
Savings: $50,241 Cost: $154,466 |
$(-4,343) | (-49,920) | $193 | 50 | $392 | 50 | $54,000 | - | - | - |
$(-4,343) (-49,920) kWh |
$193 50 Tgal |
$392 50 Tgal |
$54,000 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,609 Cost: $51,689 |
$7,609 | 87,460 | - | - | - | - | - | - | - | - |
$7,609 87,460 kWh |
- - Tgal |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $56,850 Cost: $580,000 |
$9,345 | 107,410 | - | - | - | - | - | - | $47,505 | - |
$9,345 107,410 kWh |
- - Tgal |
- - Tgal |
- - $ |
$47,505 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $38,616 Cost: $514,800 |
$38,616 | 443,867 | - | - | - | - | - | - | - | - |
$38,616 443,867 kWh |
- - Tgal |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $159,615 Cost: $1,318,595 |
$57,526 | 661,219 | $193 | 50 | $392 | 50 | $54,000 | - | $47,505 | - | $57,526 661,219 kWh |
$193 50 Tgal |
$392 50 Tgal |
$54,000 - $ |
$47,505 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - Tgal |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | Tgal | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Usage | Water Disposal | Ancillary Material Cost | Increase in Production | Electricity Usage | Water Usage | Water Disposal | Ancillary Material Cost | Increase in Production |