IAC logo
IAC Assessment: LS2509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2025
Principal Product Calcine
NAICS 324199 - All Other Petroleum and Coal Products Manufacturing
SIC 2999 - Petroleum And Coal Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 67
Plant Area (Sq.Ft.) 215,372
Annual Production 800,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $480,792 6,648,600 kWh $0.07
Electricity Demand $45,567 10,896 kW-months/year $4.18
Natural Gas $716,742 286,856 MMBtu $2.50
Other Energy $317,564 10,902 MMBtu $29.13
TOTAL ENERGY COSTS $1,560,665
RECOMMENDED SAVINGS* $507,065 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Primary Product Electricity Usage Natural Gas Other Energy Administrative Changes Primary Product
$ kWh $ MMBtu $ MMBtu $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$40,834
Cost:
$25,000
$40,834 567,141 - - - - - - - - $40,834
567,141
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$12,547
Cost:
$16,300
$12,547 174,266 - - - - - - - - $12,547
174,266
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 3.7221 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL Savings:
$56,956
Cost:
$80,000
- - - - - - $55,000 - $1,956 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$55,000
-
$
$1,956
-
$
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$127,011
Cost:
$200,000
$2,719 37,769 - - - - $124,292 - - - $2,719
37,769
kWh
-
-
MMBtu
-
-
MMBtu
$124,292
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,218
Cost:
$2,700
$1,218 16,921 - - - - - - - - $1,218
16,921
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$53,529
Cost:
$144,549
$(-2,076) (-28,829) - - $31,605 1,085 $24,000 - - - $(-2,076)
(-28,829)
kWh
-
-
MMBtu
$31,605
1,085
MMBtu
$24,000
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$214,970
Cost:
$1,500,000
- - $214,970 86,057 - - - - - - -
-
kWh
$214,970
86,057
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$507,065
Cost:
$1,968,549
$55,242 767,268 $214,970 86,057 $31,605 1,085 $203,292 - $1,956 - $55,242
767,268
kWh
$214,970
86,057
MMBtu
$31,605
1,085
MMBtu
$203,292
-
$
$1,956
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Primary Product Electricity Usage Natural Gas Other Energy Administrative Changes Primary Product