Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2025
Principal Product Sodium Silicates
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 13
Plant Area (Sq.Ft.) 60,077
Annual Production 73,076,923 Pounds
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,552 1,156,000 kWh $0.06
Electricity Demand $35,618 2,182 kW-months/year $16.32
Natural Gas $524,092 188,432 MMBtu $2.78
TOTAL ENERGY COSTS $640,262
RECOMMENDED SAVINGS* $139,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ %
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,765
Cost:
$200
$4,765 80,758 - - - - - - - - $4,765
80,758
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$287
Cost:
$50
$287 4,865 - - - - - - - - $287
4,865
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,945
Cost:
$450
$1,406 23,827 $539 33 - - - - - - $1,406
23,827
kWh
$539
33
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
04: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$24,480
Cost:
$14,000
- - - - - - $12,000 48,000 $12,480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,000
48,000
lb
$12,480
-
%
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,682
Cost:
$21,000
$28,682 486,135 - - - - - - - - $28,682
486,135
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
06: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$62,919
Cost:
$100,000
- - - - $62,919 22,630 - - - - -
-
kWh
-
-
kW-months/year
$62,919
22,630
MMBtu
-
-
lb
-
-
%
07: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$2,760
Cost:
$4,900
$1,542 26,140 - - $1,218 438 - - - - $1,542
26,140
kWh
-
-
kW-months/year
$1,218
438
MMBtu
-
-
lb
-
-
%
08: 2.1224 REPLACE BOILER Savings:
$14,158
Cost:
$66,000
- - - - $14,158 5,091 - - - - -
-
kWh
-
-
kW-months/year
$14,158
5,091
MMBtu
-
-
lb
-
-
%
TOTAL RECOMMENDED Savings:
$139,996
Cost:
$206,600
$36,682 621,725 $539 33 $78,295 28,159 $12,000 48,000 $12,480 - $36,682
621,725
kWh
$539
33
kW-months/year
$78,295
28,159
MMBtu
$12,000
48,000
lb
$12,480
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Increase in Production