IAC Assessment: LS2512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LS2512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2025
Principal Product Water Purification System
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3625 - Relays And Industrial Controls
Sales $50,000,000-$100,000,000
# of Employees 235
Plant Area (Sq.Ft.) 100,000
Annual Production 85 Units
Production Hrs. Annual 6,500
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,987 1,389,200 kWh $0.07
Electricity Demand $150,890 10,039 kW-months/year $15.03
Natural Gas $61,275 7,363 MMBtu $8.32
LPG $4,803 97 MMBtu $49.52
TOTAL ENERGY COSTS $313,955
RECOMMENDED SAVINGS* $83,261 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Ancillary Material Cost Increase in Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,432
Cost:
$1,275
$891 12,730 $541 36 - - - - - - - - - - $891
12,730
kWh
$541
36
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
02: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$16,150
Cost:
$25,000
- - - - - - - - $9,750 - $6,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$9,750
-
$
$6,400
-
$
-
-
%
03: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$6,381
Cost:
$25,003
$6,381 91,157 - - - - - - - - - - - - $6,381
91,157
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$27,997
Cost:
$144,549
$(-786) (-11,232) - - - - $4,783 97 $24,000 - - - - - $(-786)
(-11,232)
kWh
-
-
kW-months/year
-
-
MMBtu
$4,783
97
MMBtu
$24,000
-
$
-
-
$
-
-
%
05: 2.1224 REPLACE BOILER Savings:
$31,301
Cost:
$286,589
- - - - $5,051 607 - - - - - - $26,250 - -
-
kWh
-
-
kW-months/year
$5,051
607
MMBtu
-
-
MMBtu
-
-
$
-
-
$
$26,250
-
%
TOTAL RECOMMENDED Savings:
$83,261
Cost:
$482,416
$6,486 92,655 $541 36 $5,051 607 $4,783 97 $33,750 - $6,400 - $26,250 - $6,486
92,655
kWh
$541
36
kW-months/year
$5,051
607
MMBtu
$4,783
97
MMBtu
$33,750
-
$
$6,400
-
$
$26,250
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Ancillary Material Cost Increase in Production Electricity Usage Electricity Demand Natural Gas LPG Administrative Changes Ancillary Material Cost Increase in Production