Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Louisiana Tech |
---|---|
Assessment Year | 1984 |
Principal Product | LUMBER(PINE) |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $5,000,000-$10,000,000 |
# of Employees | 96 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 20,000 Thousand Feet |
Production Hrs. Annual | 4,000 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $177,425 | 3,839,097 | kWh | $0.05 |
Natural Gas | $252,650 | 58,813 | MMBtu | $4.30 |
TOTAL ENERGY COSTS | $430,075 | |||
RECOMMENDED SAVINGS* | $35,534 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,728 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $355 Cost: $577 |
$355 | 6,448 | - | - | - | - | - | - |
$355 6,448 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $551 Cost: $408 |
$733 | 15,826 | - | - | - | - | $(-182) | - |
$733 15,826 kWh |
- - MMBtu |
- - MMBtu |
$(-182) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,477 Cost: $762 |
$2,477 | 50,703 | - | - | - | - | - | - |
$2,477 50,703 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $799 Cost: $348 |
$799 | 17,292 | - | - | - | - | - | - |
$799 17,292 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $822 Cost: $840 |
$2,654 | 56,272 | - | - | $(-1,832) | (-192) | - | - |
$2,654 56,272 kWh |
- - MMBtu |
$(-1,832) (-192) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $30,530 Cost: $69,200 |
$(-11,190) | (-201,348) | $41,720 | 9,710 | - | - | - | - |
$(-11,190) (-201,348) kWh |
$41,720 9,710 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,534 Cost: $72,135 |
$(-4,172) | (-54,807) | $41,720 | 9,710 | $(-1,832) | (-192) | $(-182) | - | $(-4,172) (-54,807) kWh |
$41,720 9,710 MMBtu |
$(-1,832) (-192) MMBtu |
$(-182) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,728 Cost: $1,825 |
$3,742 | 78,546 | - | - | $(-1,832) | (-192) | $(-182) | - | $3,742 78,546 kWh |
- - MMBtu |
$(-1,832) (-192) MMBtu |
$(-182) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Administrative Changes | Electricity Usage | Natural Gas | Other Energy | Administrative Changes |