IAC Assessment: LT0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1984
Principal Product LUMBER(PINE)
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 96
Plant Area (Sq.Ft.) 0
Annual Production 20,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $177,425 3,839,097 kWh $0.05
Natural Gas $252,650 58,813 MMBtu $4.30
TOTAL ENERGY COSTS $430,075
RECOMMENDED SAVINGS* $35,534 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,728
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$355
Cost:
$577
$355 6,448 - - - - - - $355
6,448
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$551
Cost:
$408
$733 15,826 - - - - $(-182) - $733
15,826
kWh
-
-
MMBtu
-
-
MMBtu
$(-182)
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,477
Cost:
$762
$2,477 50,703 - - - - - - $2,477
50,703
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$799
Cost:
$348
$799 17,292 - - - - - - $799
17,292
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$822
Cost:
$840
$2,654 56,272 - - $(-1,832) (-192) - - $2,654
56,272
kWh
-
-
MMBtu
$(-1,832)
(-192)
MMBtu
-
-
$
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$30,530
Cost:
$69,200
$(-11,190) (-201,348) $41,720 9,710 - - - - $(-11,190)
(-201,348)
kWh
$41,720
9,710
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$35,534
Cost:
$72,135
$(-4,172) (-54,807) $41,720 9,710 $(-1,832) (-192) $(-182) - $(-4,172)
(-54,807)
kWh
$41,720
9,710
MMBtu
$(-1,832)
(-192)
MMBtu
$(-182)
-
$
TOTAL IMPLEMENTED Savings:
$1,728
Cost:
$1,825
$3,742 78,546 - - $(-1,832) (-192) $(-182) - $3,742
78,546
kWh
-
-
MMBtu
$(-1,832)
(-192)
MMBtu
$(-182)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes